Dredging equipment · Amphibious excavators
You name the excavator brand for the upper structure. We source the complete machine and a pontoon undercarriage matched to your job, with the long front and bucket specified together. Sourcing and shipping are available to buyers worldwide.
Delivered configuration, 2025: 22 t-class upper, approximately 30 t operating weight. This is one past order, not a universal specification.
Before you choose a size
It is a standard excavator upper on two sealed steel pontoons that carry their own track chains. You will also see it sold as a swamp buggy, marsh buggy, floating or pontoon excavator. For the two-pontoon configuration we delivered, floating and working are different conditions. The limits below come from its factory manual; they are selection guidance for this configuration, not operating instructions for every amphibious excavator.
Digs
Wide tracked pontoons spread the weight over soft ground and marsh. Check the bottom and obstacles before choosing a machine; this configuration is intended for light-duty excavation.
Digs
For the delivered configuration, the manual specifies shallow-water work with the tracks supported. It also sets current and weather limits; depth alone does not establish suitability.
Crosses only
The manual permits passage under its balance and operating conditions. It prohibits digging, slewing or moving the front while freely floating. A different working setup needs factory confirmation.
A quoted 30 t-class option includes two side pontoons and two 8 m spud poles. Their presence does not establish a permitted working depth. The factory must confirm the complete setup, stability and site conditions before it is selected.
What arrives
The upper you specify · Cab, engine, hydraulics, long boom and arm, in the brand and model you name. The 2025 machines used a 22 t-class upper with a 12 m long front and a 0.8 m³ bucket.
1
2
3
4
Sealed steel boxes in Q355B structural steel, 9.0 × 1.3 × 1.8 m each on the delivered machines.
The upper bolts onto it through its own slewing ring.
Join the frame to the pontoons and set the overall width: 4.1 m.
Two rows of chain per pontoon, driven by a new hydraulic travel motor. The motor maker is written into the contract.
Hoses and fittings are included. Already own the excavator? The pontoon set is sold on its own, centre frame included. Send the make and model so the frame matches its slewing ring.
Size classes
Choose the class by the reach and bucket the job needs, then check the width you can ship. One row is the configuration we delivered. The other three are factory quotations from 2025.
On a small screen, scroll the table sideways to compare all specifications.
| Excavator class | Long front | Bucket | Main pontoon L × W × H | Overall width | Travel motors | Record |
|---|---|---|---|---|---|---|
| 12 t class | 8 m | 0.33 m³ | 6.1 × 1.1 × 1.64 m | 3.4 m | 2 | Factory quote, 2025 |
| 16 t class | 10 m | 0.6 m³ | 6.1 × 1.1 × 1.64 m | 3.4 m | 2 | Factory quote, 2025 |
| 22 t class | 12 m | 0.8 m³ | 9.0 × 1.3 × 1.8 m | 4.1 m | 2 | Delivered ×5, 2025 |
| 30 t class | 14 m | 0.6 or 0.8 m³ | 9.5 × 1.8 × 2.0 m | 5.4 m | 4 | Factory quote, 2025 |
30 t class: three rows of chain per pontoon, plastic track pads, two side pontoons 9.0 × 1.5 × 1.2 m and two automatic spud poles Ø273 mm × 8 m. A 10.5 m extended pontoon is also quoted.
Price reference: each 22 t-class machine on the 2025 order cost under $100,000, fixed in the contract. Freight was a separate line.
Watch loading · 2 min
Getting it to site
The delivered configuration was 4.1 m wide when assembled. For the Kazakhstan shipment, we separated the uppers, pontoons and beams and planned the trucks around their packed dimensions.
The five machines for Kazakhstan left on eight flatbeds for the roughly 4,000 km route to Khorgos, with separately ordered spare parts sharing some loads. The recorded 3.0 m-wide upper is too wide for a standard closed container. Sea options must be checked against the actual packed dimensions and route. Plan unloading and reassembly equipment with the factory and the local lifting team.
Delivered in 2025
After delivery
On the 2025 contract: 12 months or 2,000 engine hours. In the factory's 2025 quotations for pontoon sets, the pontoon body is covered for 1 year or 2,000 hours. Track chains and pads count as wear parts: 6 months or 500 hours, whichever comes first. The quoted warranty excludes modified pontoons and non-original parts. Current coverage must be stated in your own quotation and contract.
Track chain, track pads, pins and wear plates. The manual identifies a 2 mm wear-plate replacement threshold and requires any leaking pontoon to leave the water for repair and a seal test. In 2026 the same client came back to us for 400 m of track chain and a batch of pin shafts for the excavators.
| When | What to do |
|---|---|
| Every shift (8 h) | Grease every point on the pontoons and the upper. |
| New chain | Check tension every 10 h. It settles after about 30 h. |
| Final drives | First oil change at 150 h, then every 1,000 h: 85W-90 gear oil, 6 L. |
| After each job | Wash off the mud and oil the chains. |
| A pontoon leaks | Bring it out of the water, repair, and seal-test before it goes back in. |
Next step
We take your brief to the factory and return a configuration, a drawing of the pontoon set and the factory price. You pay the factory invoice; we add nothing to it. Our income is the export VAT rebate China pays on the machine, not a kickback from any factory. How we are paid