XILINK · Aquatic vegetation equipment
Aquatic weed harvesters
Buy a complete removal cycle for your waterway. Match the plant, working water depth, storage and receiving bank before comparing cutter width or quoted capacity.
Send my vegetation projectSend a plant photo and a wide view of the unloading bank. Add water depth if you know it.
See the vessel during unloading
Our public video shows the hull, cab and front conveyor during crane unloading. It records handling, not an on-water cutting or capacity test. The historical dimensions alongside are supported by a separate order file.
A weed harvester must unload what it collects
A wider cutter does not solve a full storage hold or an unreachable unloading bank. Compare these interfaces in the same factory offer.
| Handover | Equipment to reconcile | Site condition that changes it |
|---|---|---|
| Plant → intake | Cutting head and working range, collection opening, conveyor mesh or belt and retention. | Plant type, stem density, submerged depth and mixed debris. Check that cut material actually enters the conveyor. |
| Conveyor → storage | Conveyor route, storage volume and permitted wet load as a single arrangement. | Bulky reeds and dense wet vegetation fill and load the boat differently. Volume and mass limits both need checking. |
| Loaded boat → waterway | Full-load draught, propulsion, turning space and operating clearances. | Seasonal water level, underwater obstructions, bridge clearance and distance to the receiving bank. Cutting depth is a separate dimension. |
| Unloading → shore transport | Unloading height and reach, receiving point, truck access and any separate shore conveyor. | Measure from the operating water level to the actual receiving equipment. Include the travel, unloading and return time in the working cycle. |
Why cutting rate is different from daily removal
Illustrative arithmetic: 60 minutes cutting and collecting plus 20 minutes of travel, unloading and return gives an 80-minute cycle. An eight-hour shift contains six such cycles and six cutting hours, before refuelling, maintenance or delays. These assumed times do not predict site output; they show why storage and unloading belong in the comparison.
2025 · One harvester · China to Kazakhstan
Our original order file contains the supply contract, technical passport and export transport documents. The technical sheet records the following configuration. These are historical values, not stock dimensions or performance promised for a new order.
- Overall length
- 15.6 m
- Overall width
- 4.4 m
- Design draught
- 0.7 m
- Engine power
- 90 kW
Overall size includes equipment beyond the bare hull. Confirm current operating and transport drawings for your waterway, unloading point and shipping route.
Send a plant photo and a wide view of the unloading bank. Add water depth if you know it.
Send my vegetation projectStart with the plant, then the collection mechanism.

Floating mats and loose vegetation
Collection and retention may matter more than cutting depth. Check whether the intake and conveyor can pick up the plant without pushing it aside or letting it fall back. If litter is mixed in, identify it separately for the factory review.
Rooted reed and dense stems
The cutting mechanism must be reviewed for stem size, density and access. Define the required cut level and how the cut material reaches storage. Cutting stems does not establish root removal, and regrowth expectations belong to the site’s vegetation-management plan.
Submerged growth and shallow water
Working depth is measured at the tool, while draught concerns the hull. Check both against the operating water level, full-load condition, underwater obstructions and the clearance the supplier requires. A vegetation harvester does not automatically become a mineral-sediment dredger.
What the factory offer and demonstration should settle.
Mechanisms under agreed conditions
Agree how cutting, collecting, conveying and unloading will be demonstrated before shipment. A dry mechanism run verifies movement under that condition; representative vegetation, load and water trials answer different questions. Record the trial material, operating conditions and limitations with the results.
Transport, reassembly and operation
Confirm transport dimensions and mass for the agreed configuration, removable sections, lifting provisions and destination reassembly. Bridges, launching access, local vessel requirements and operator training must be reviewed for the actual location. Cutter, conveyor and hydraulic spare parts need a model-linked list.
A useful brief to start with
Send close and wide plant photographs, water depth and seasonal water levels, the area to clear, receiving-bank photos and access limitations. Tell us whether the job is floating-weed collection, stem cutting, root removal or sediment removal. We can reconcile the equipment route and factory questions before a scoped quotation.
Send my vegetation project
Send a plant photo and a wide view of the unloading bank. Add water depth if you know it.
We review the requirements and identify the information the factory needs before preparing a scoped quotation. Unknown details can be discussed.
The supply and transport scope is checked for your destination, including the local installation boundary.
