HDPE & PVC pipe sourcing
Water supply · irrigation · China sourcingOne complete enquiry.
XILINK coordinates factory enquiries for your pipes, fittings and delivery scope. Start with your list, then compare offers on the same specification and destination.

| Pipe specification | Quantity |
|---|---|
| 630 mm · SDR 17 | 18,000 m |
| 560 mm · SDR 17 | 2,700 m |
| 450 mm · SDR 11 | 10,000 m |
Supply length & joints · Fittings & interfaces · Standard & documents
Specification example from our November 2024 quotation. The figures show the requested pipe mix; current prices and delivery terms need a new enquiry.
The original estimate used an EXW price basis. Naming Taraz as the destination did not make transport part of that price.
A lower price per metre is useful only when the offers describe the same pipe. Start with the material and dimensional basis, then check the project conditions.
At the same outside diameter, a lower SDR means a thicker wall. SDR alone does not settle the pressure requirement: the material, design standard and operating conditions also matter. Use the project specification as the reference.
| Specify | Put in the enquiry | What this resolves |
|---|---|---|
| HDPE / PE100 | Put in the enquiryState the PE material grade, outside diameter, SDR or wall thickness, operating requirements and project standard. | What this resolvesKeep pipe and fitting requirements together. A generic “HDPE” description leaves the quotation open. |
| PVC | Put in the enquiryState the specified PVC type, dimensional standard, pressure requirement, supply length and jointing system. | What this resolvesKeep a separate PVC line. Do not assume a PE diameter, pressure label or connection can be substituted. |
| Potable water / irrigation | Put in the enquiryIdentify the actual application and any required drinking-water approvals or project test documents. | What this resolvesAsk for the required evidence for the proposed product and scope, rather than a general factory certificate. |
A pipe-only offer can leave the installation incomplete. Send the fitting schedule or drawing so each bend, branch and transition is included in the enquiry.
Butt fusion, electrofusion or the specified mechanical system: identify the method and the compatible size / SDR range. Confirm the installation equipment separately.
List elbows, tees and reducers by material, size, pressure requirement and quantity. A pipe metre total does not count these parts.
For flanges and valve interfaces, send the connection standard and dimensions. Confirm backing rings, gaskets and bolts are in the agreed scope.
Connection sketches identify enquiry items; final compatibility follows the approved project design and the manufacturer’s specification.
The Taraz quotation gives a concrete example: the pipe quantities were priced on an EXW basis, while the transport line had no amount. That document was an estimate, not a delivered-cost quotation.
We bring the pipe schedule, factory enquiries, fitting scope and proposed transport arrangement into the same comparison. You can bring an offer you already have and show exactly what it includes.
Read the XILINK fee structureMaterial, diameter, SDR / wall thickness, quantities, fitting schedule and required documents.
Supply lengths, packing method, handling and transport from the agreed collection point.
Route, named delivery point and trade term; identify the freight, handling, clearance, duties or final delivery that sit outside the offer.
Keep the sourcing fee structure and any requested audit or inspection scope visible separately.
Compare identical specifications and the same delivery point. Mark each cost as included, separately quoted or unconfirmed.
A diameter mix alone cannot establish a container count. Length per piece, packing dimensions and unloading access change the transport plan.
Confirm the supply form and length for each size. Do not assume every diameter is available in the same form.
Nesting depends on clearance, protection, restraint and a practical way to remove the inner pipes. Check those details before treating empty space as a freight saving.
Identify the receiving site, lifting equipment and access. Agree the handling arrangement as part of the packing plan.
Set the checks and acceptance criteria in the agreed inspection scope. A photograph or a general certificate does not replace the specified tests.
You do not need to have every field settled before contacting us. Send the pipe sizes, quantities and your destination; mark the remaining details as unconfirmed.
We review what is specified and what needs clarification for the factory enquiry.
The product, fittings and delivery scope can be aligned before offers are compared.