Indonesia · river sand procurement
A washer price is only useful when you know what enters the line, what product must leave it, and who supplies the connections between them. Compare the sand-processing duty, pumping duty and water circuit together before accepting an equipment list as a complete plant.
Send river sand requirementsScreened material continues down to the next duty. Oversize leaves through the separate right-hand outlet. Process routing remains material-dependent.
What enters
What must leave
River sand is a source description, not a complete process specification. A feed with coarse particles, clay-bound lumps and suspended fines presents different duties from an already-sized sand that needs a final wash. A photograph can show the material and equipment, but cannot establish the feed gradation or whether the final sand meets its intended use.
Put the feed sieve analysis beside the target product grading. Keep clay and silt observations, feed moisture and slurry solids information with the sample results. The useful question is which fractions must be retained, liberated or removed. The product requirement also needs a defined cleanliness and moisture basis for acceptance. A supplier should explain how the proposed process addresses those requirements, with testing where needed; a machine name does not settle them.
McLanahan's sand-plant guidance connects the choice of process to the raw feed and desired product, and describes laboratory checks including sieve analysis, scrubbing and settling tests. These are ways to establish a process basis, not results already obtained for your material.
Pump flow is not finished-sand output. Conversion needs the solids basis, density and a feed/product/waste balance. Unconfirmed yield remains unconfirmed.
Slurry flow in m³/h describes a volume of water and solids moving through a pumping duty. Dry-feed t/h describes the mass of dry solids entering the process. Conforming-product t/h describes the sand that leaves within the agreed product specification. They answer different questions.
Adding water can change the volume pumped without adding dry sand. Rejecting oversize or unwanted fines changes the product balance. Recovering more fine solids is useful only if the relevant product requirement permits them. Converting a slurry figure into a product figure needs the solids basis and density information, followed by a feed/product/waste balance. A pump flow entry alone does not provide them.
For an offer headed with a capacity figure, retain its unit and operating basis. The comparison should show where that figure applies: pump flow, dry feed or conforming product. Ask the supplier to connect the equipment duties through a material and water balance. Unconfirmed yield remains unconfirmed; it should not become a finished-sand promise in the quotation summary.
Choose a duty to read its procurement checks. This explains responsibilities; it does not select a process for your material.
Screening separates particle sizes so that the following equipment receives suitable fractions and the product can follow its intended grading. A screen near feed preparation may remove oversize; another separation after preparation may deal with material released from lumps. Ask where each screen's retained and passing material goes. A screen specification without those destinations leaves the process incomplete.
Scrubbing addresses material attached to grains or held in clay-bound lumps. McLanahan describes particle-on-particle action that releases clay and other unwanted material. Released contamination then still needs a separation route. More spray water is not evidence that a proposal provides the same scrubbing duty. Where the feed contains persistent clay, the supplier needs to justify the preparation equipment against the material, rather than simply adding a washer to the list.
Classification separates particles according to size or density. MEKA's compact sand-plant description gives a useful example: slurry is pumped to a hydrocyclone; water with silt and clay leaves at the top, while the sand stream leaves below for dewatering. This describes equipment responsibilities, not a guaranteed separation for every river deposit. Cut size, feed solids, operating conditions and product performance require confirmation for the offered arrangement.
Agree grading, cleanliness, moisture and sampling.
Confirm water quality, storage and where it returns.
Name the handling route and responsible party.
Recovered fines are not automatically saleable sand. Their destination depends on product acceptance.
Fine material in wash water is not automatically waste, and everything recovered is not automatically a saleable product. Compare the recovered fraction with the required grading and cleanliness. McLanahan's fines-recovery guidance describes recovering fine material from an effluent stream. The procurement decision is whether that recovered fraction belongs in the main product, a separate product or the waste route. The supplier must explain the proposed return point and how product compliance will be checked.
Dewatering removes excess water from the product stream. It does not by itself demonstrate that the product's grading or clay requirement has been met. Agree the product moisture basis and the conditions for checking it, including where the sample is taken. A dry-looking stockpile photograph cannot replace those results.
The water circuit also has a solids outlet. CDE's water-management range distinguishes thickeners, water tanks, dosing equipment and sludge-dewatering equipment. Recovered process water needs a return route and storage arrangement; separated sludge needs a defined handling destination. A water-recycling statement without the sludge route leaves part of the plant unaccounted for. The selected system's water demand, make-up water and returned-water quality need the supplier's process confirmation. A manufacturer's maximum recycling claim is not a result for this enquiry.
Supplier equipment example
Three recorded sheet entries, not one verified operating point. None is a finished-sand t/h figure.

An archived 350PNS-35 configuration sheet lists pump flow of 1800 m³/h, head of 35 m and diesel-engine power of 397 kW. These are three separate entries: flow describes the pumping volume; head describes the pumping duty; engine power identifies the listed drive. None states how many tonnes of conforming sand a washing line produces.
The same sheet includes a gearbox, base and cooling/seal-water circuit. That matters when comparing a bare pump with a driven pumping set. The supplier still needs to confirm the operating point for the actual slurry and pipeline, the applicable drive and speed, and the matching configuration revision. The sheet is a supplier example; it does not establish a washing-line specification or a project production result.
A separate buyer enquiry
In a separate slurry-pump enquiry, a buyer asked for the pump inlet and outlet diameters so that local materials could be ordered. The recorded reply gave DN350 at the inlet and DN300 at the outlet.
The diameter reply resolves an initial sizing question. It does not establish the connection drawing, flange pattern, bolt-hole spacing, pressure designation, orientation or adaptor arrangement for the offered revision. Ordering local pipework from DN alone can therefore leave an unresolved physical connection. Obtain the matching drawing and have the supplier and receiving-side installer agree the mating details before ordering those parts.
The correspondence also corrected the gearbox specification to model 400 with a 1.5:1 ratio. The gearbox correction also shows why a previous document cannot silently stand in for the final configuration.
Separately, the buyer discussed additional pumps on shore to move sludge onward and requested a 400 m³/h sludge pump.
A shore-pumping question makes the receiving point important: where does the slurry arrive, at what elevation, and through which pipe route? Pipeline distance, changes in level and the downstream requirement belong in the pump-duty assessment.
They cannot be settled by repeating the pump's catalogue flow. The supplier should confirm the duty against the intended route and slurry conditions.
Carry that connection logic through the washing proposal. Identify the feed receiving point, product discharge and stockpiling route, process-water supply and return, and sludge destination.
The comparison also needs the electrical supply and motor requirements, control-panel scope and operating interfaces. Foundations, access, pipe supports, local pipework and field connections need a named responsible party and approved information; do not assume they arrive with the washer.
Before comparing totals, align the equipment list with its drawings and included accessories. Keep transport, unloading, installation, commissioning and acceptance responsibilities explicit.
A proposed trial or factory check needs defined material, operating conditions, sampling and acceptance criteria. Supplier-confirmed process performance and the installed site's acceptance are separate steps, each with its own responsibility.
Send XILINK your available feed information, target sand requirement, site destination and any supplier offers or existing-equipment drawings. Mark missing test results or site details as unconfirmed.
We help align the offers against the same feed and product brief: what each machine is responsible for, which capacity unit is being quoted, where sand, water and waste leave, and which connections and work are included. We identify mismatches and open items for supplier clarification, so the buyer and technical reviewer can compare the same proposed scope. Process selection and performance still need the supplier's confirmation against the actual material and site conditions.