Your list is written into a signed contract — specs fixed, certificates fixed, deadline fixed. We source every line, check it before your money moves, and ship to your construction schedule.
A Canadian building company, building in Vancouver and in Khao Yai, Thailand. Nine orders so far, more than US$20,000 — placed in construction order, not in one shopping cart.
We film the checks.
This is us on-site in Foshan, walking a sauna & hot-tub supplier's showroom — the same way every line on your list gets looked at before you pay.
Also filmed: flooring samples · wall panel showroom · our YouTube channel.
This one row travelled the whole route below — quoted against the drawings, filmed in production, consolidated with the flooring and the tiles, and delivered with the fit-out batch. That is what "line by line" means in practice.
And if a line cannot be met as written, you hear it at the quoting stage — not after the deposit.
Paste it, Excel, PDF, or the drawing set — whatever the tender gave you.
Profile series, glass, hardware, thermal spec — checked before anyone quotes.
Two to three plants matched on spec, not on price alone.
Samples and video before any deposit moves.
You see your actual windows before the balance.
Consolidated with the rest of your list, one document set.
Timed to your construction phase, not the factory's.
Nothing is bought on a promise — yours or ours.
Your actual goods filmed at the factory before the balance moves.
Not before. If the check fails, the balance stays with you.
| The risk | Where it dies |
|---|---|
| A line that doesn't match the contract | Matched against your drawings and specs before the order — not argued about after. |
| The certificate your market demands — CSA, UL, EAC | Confirmed with the factory before the deposit moves. |
| One late item idling a paid crew | Consolidation planned around your phases; batches leave by construction stage. |
| A surprise at the port | Landed cost — duty, VAT, fees — worked out before you sign. Try the landed-cost calculator |
Within one working day a person confirms your list and asks only for what is missing — a drawing, a standard, a delivery city. Then factories quote. Then your list comes back, line by line.
We answer in English, Russian, French and Spanish.