XILINK · Project lining materials
Dam & reservoir liners
Procurement details · not a construction design
- 1 · Field panels
- Roll layout, slope length and seams
- 2 · Crest and edges
- Anchorage and termination details
- 3 · Structures and pipes
- Connections, boots and sealing scope
- 4 · Support and protection
- Specified contacts, drainage and site preparation
Keep the membrane, protection, anchorage and drainage connected to the engineer’s section. A material thickness on its own is not a reservoir lining design.
We coordinate membrane and supporting geosynthetic offers against the same project revisions, quantities and test requirements. A historical Central Asian hydropower enquiry illustrates the multi-material procurement scope, not completed installation work.
Send my reservoir specificationSend the section, BOQ or specification you already have. The design authority keeps responsibility for the lining design.
Dam liner procurement: keep each project layer distinct
A 2024 hydropower enquiry in our records listed geomembrane, geotextile, GCL, geogrid and geocell together. It was an enquiry, not a completed dam installation. The procurement lesson is to preserve each material’s purpose and location instead of treating five products as one interchangeable liner.
| Material | Role to confirm in the drawing | Purchase definition |
|---|---|---|
| Geomembrane | Specified polymer barrier, with seams and terminations forming a continuous system. | Polymer, surface, thickness basis, durability requirements, test specification and edition. |
| Protection geotextile | Protection at the contacts identified by the design; its position and loading are project-specific. | Polymer and construction, puncture and tensile properties, hydraulic requirements and test methods. |
| GCL | Bentonite-based barrier where specified, with compatible hydration, confinement and contact materials. | Bentonite loading versus total product mass, carrier layers, hydraulic properties and chemical compatibility. |
| Geogrid | Reinforcement in the zones where the engineer requires it; it is not a water barrier. | Type, strength direction, design properties, junctions and specified tests. |
| Geocell | Cellular confinement or erosion-control function in its designated zone. | Cell geometry, strip and junction properties, infill and connection details. |
The approved section controls which layers are required and their sequence. Quantities, widths and overlaps belong to separate schedules for each material and zone. Keep proposed substitutions visible for the project designer’s decision before factories turn them into an order.
A specification needs the method, edition and result basis.
For example, where a project specifies GRI-GM13 Revision 19 (11 June 2025) for 2.0 mm smooth HDPE, these are separate checks. They are manufacturing specification criteria, not our batch test results or a recommended thickness for your dam.
| Criterion | Example requirement | Read with the offer and test report |
|---|---|---|
| Minimum average thickness | 2.0 mm · ASTM D5199 | The average requirement is the nominal thickness. Do not replace it with the lowest individual allowance. |
| Lowest individual of 10 values | 1.8 mm · ASTM D5199 | Nominal minus 10% in this example; a separate criterion from the average. |
| Tensile yield strength | 29 kN/m · ASTM D6693 Type IV | Check the required minimum-average basis and the test direction. |
| Puncture resistance | 640 N · ASTM D4833 | An index test requirement, not proof that the installed liner can withstand every site contact. |
Source: Geosynthetic Institute, GRI-GM13 Rev. 19, Table 1(b). The project may add or supersede requirements. Read the original specification
Match the roll to the report.
A report with the right logo but the wrong product, method or sample identity does not verify the ordered material. Agree batch and roll traceability, sampling and any independent tests in the purchase scope. Sheet tests and completed seam acceptance remain different evidence.
Send the section, BOQ or specification you already have. The design authority keeps responsibility for the lining design.
Send my reservoir specificationChoose roll sizes with the panel plan and slope access.
4 panels × 7 m
3 longitudinal seams × 50 m = 150 m of seam.
8 panels × 3.5 m
7 longitudinal seams × 50 m = 350 m of seam.
Illustration only: a flat 28 × 50 m rectangle, continuous panels, no overlaps, anchors, details or waste. These are not factory roll offers or a reservoir panel design. Wider panels reduce seam lines here but double panel area and mass at the same material thickness and density.
Choose the roll width and length with the approved layout, slope access and lifting method. The designer and installer determine seam orientation, difficult details and permitted prefabrication; procurement checks that the factory can make and pack those rolls. Confirm unloading and access to the placement point before choosing more area per roll.
Keep material supply and installed-system acceptance connected.
Before manufacturing
Freeze the approved specification, drawing revisions, material quantities and roll schedule. Identify deviations, accessories and transport dimensions. XILINK coordinates factory sourcing and comparison against that agreed supply scope.
Before installation
Name the parties responsible for subgrade acceptance, roll handling, installer qualification, welding trials and the field test plan. Groundwater uplift, drainage, interface stability and anchorage are project design questions; they cannot be settled by a membrane unit price.
At handover
The installed system needs the agreed seam records, repair and retest evidence, material identities and as-built information. Define who performs and accepts these checks. Factory material documents alone do not demonstrate the watertightness of the completed reservoir.
Send my reservoir specification
Send the section, BOQ or specification you already have. The design authority keeps responsibility for the lining design.
We review the requirements and identify the information the factory needs before preparing a scoped quotation. Unknown details can be discussed.
The supply and transport scope is checked for your destination, including the local installation boundary.