Dredger sizing & budget
Turn the area, sediment layer and programme into a removal target. Then build a budget from actual equipment, pipeline, freight and site quotations.
Add the calculation to your enquiry, even if some budget lines are still unknown.
Calculate dredging volume and the daily target
Add your quoted costs (optional)
Planning result
All initial site values are illustrative. Volume uses sediment area × removal thickness; water depth stays separate. Distance and rise are carried into the enquiry for supplier sizing, not used to invent pump output. Cost entries of 0 mean no quotations entered.Add results to my enquirySelect the process that can handle the material.
Fine, pumpable sediment
Assess suction or cutter-suction dredging against particle sizes, cohesion, depth and discharge duty. Confirm which output is being offered: mixture, dry solids or in-situ excavation. The receiving pad and dewatering route must accept the same planned rate.
Roots, rubble and bank work
Assess mechanical excavation, sorting and handling of oversize material. An amphibious excavator or attachment is evaluated with ground conditions, stability and working envelope; a large pump rating does not solve access or blockage by itself.
Floating or rooted vegetation
A cut-and-collect boat is assessed by plant type, collection, storage, travel and unloading. A sediment-volume result is not its vegetation payload. Check the bank connection and the full cycle rather than treating every water-cleaning task as dredging.
Make the budget lines cover the same scope.
The editable cost lines cover equipment, pipe and floats, spares, testing, transport, site assembly and a contingency chosen by you. Zero means you have entered no cost; it does not mean that item is free. Customs, local taxes, permits, operation and disposal must be added where applicable. A total is a planning sum, not an offer or a landed-cost guarantee.
| Cost group | Check before entering a value |
|---|---|
| Equipment and connections | Machine, drive, pump, complete discharge length, floats, joints, receiving interface and quoted spares. Avoid counting included accessories twice. |
| Transport and site work | Factory collection, international route, destination handling, inland delivery, assembly and any agreed commissioning. Confirm currency, date and delivery basis. |
| Other project costs | Use the other-cost line for your applicable duties, taxes, permits, operation and disposal. They are not automatically included in an equipment quote. |
The contingency is applied once to the costs you enter. It cannot price missing work or cover an undefined supply boundary. Share the copied result and the underlying quotations; keep unknowns explicit so we can compare factory proposals on the same basis.
Add the calculation to your enquiry, even if some budget lines are still unknown.
Review my dredging worksheetRead the result as a work target, not machine output.
| Result | How it is calculated | What still needs checking |
|---|---|---|
| In-situ volume | Sediment area × average removal. Example: 6,000 × 0.30 = 1,800 m³. | Survey uncertainty, variable thickness, debris and any required overdepth. Irregular areas need surveyed quantities. |
| Daily target | Volume ÷ working days. Example: 1,800 ÷ 30 = 60 m³/day. | Working days are not calendar days. Mobilisation, weather, access and local restrictions can reduce available time. |
| Hourly target | Daily target ÷ productive hours. Example: 60 ÷ 6 = 10 m³/h in situ. | Use effective dredging time after moves, servicing and interruptions. The pump carries slurry; mixture m³/h is a different quantity. |
The worksheet does not calculate a slurry concentration, a pump curve or a model recommendation. The material selector gives a route to assess. Distance and rise are copied to the project brief because a supplier must evaluate them with the material and system duty.
Illustrative rectangular sediment area. The calculator starts with 0.30 m removal over 30 working days and 6 productive hours per day. Replace these planning assumptions with your survey and programme.
Water depth determines working access and dredging reach. Removal thickness determines the quantity to excavate. A 4 m water depth does not mean removing 4 m of sediment.
Review my dredging worksheet
Add the calculation to your enquiry, even if some budget lines are still unknown.
We review the requirements and identify the information the factory needs before preparing a scoped quotation. Unknown details can be discussed.
The supply and transport scope is checked for your destination, including the local installation boundary.
Discuss on WhatsApp