XILINK · Equipment support
Dredging equipment wear parts

Keep the replacement connected to the original boat, pump or amphibious undercarriage. We coordinate spares through the supplied equipment’s factory and records.
Identify my wear partsSend your original order reference and a photo of the worn assembly. This route supports our supplied equipment; it is not a universal part-number catalogue.
Pump, cutter and chain spares: match the equipment first
These are identification fields, not a universal stock list. The factory must confirm the actual construction and mating interfaces for the machine being supported.
| Assembly | Match before quoting | Include in the supply scope |
|---|---|---|
| Dredging pump | Pump model and serial, impeller identity, casing or liner arrangement, shaft and seal configuration, rotation and connections. | Confirm whether seals, gaskets, fasteners and mating wear parts are included or separate. |
| Cutter and drive | Tooth and adapter type, fixing method, cutter mounting and the actual hydraulic or mechanical drive interface. | Count the fitted positions and distinguish complete adapters from replaceable tips. |
| Amphibious undercarriage | Original chain drawing, pitch and link count, shoe attachments, pin/bush arrangement and mating sprockets. | Define metres, links or complete assemblies explicitly. Check the complete set, not one loose sample. |
A documented starting point
Our 2026 records distinguish a 400 m excavator-chain order from a separate 2,000-piece pin-shaft order. The parts belong to different assemblies; the original machine and drawing remain the matching basis.
A separate procurement request listed four pump packages and three maintenance sets. Spare-set quantity is a separate purchase line, not automatically one set per pump. Confirm the list and quantity for your operating plan.
Keep three identities on the same enquiry.
The machine
Manufacturer, complete model, serial number and original XILINK order if available. Include a readable nameplate and an overall photograph. Model families may contain different versions; the serial and original configuration help locate the right records.
The part
Part number, drawing revision, material specification and quantity. Photograph any cast or stamped marks. If a dimension is taken from a worn surface, mark it as a measurement of the used part, not the new-part nominal size.
The installed assembly
Show where the part sits and what it mates with. Include fixing points, coupling faces, direction and adjacent components. A clear assembly photograph can reveal why two parts with a similar outline are not interchangeable.
Send your original order reference and a photo of the worn assembly. This route supports our supplied equipment; it is not a universal part-number catalogue.
Identify my wear partsWhen the old part does not match the drawing.
Separate wear from specification
A smaller pin diameter or elongated chain does not automatically define the replacement size. Record the used measurement alongside the original drawing. If the drawing is missing, agree which unworn datums and mating components the factory needs before confirming manufacture.
Record the operating problem
Tell us where wear appears, operating hours, pumped material and any blockage, leakage or abnormal vibration. Repeating the same part without reviewing an abnormal failure can repeat the stoppage. Diagnosis and any revised construction need the equipment maker’s review.
Confirm the replacement basis
The offer should identify original-factory supply or a documented alternative, the applicable drawing and any deviations. A photograph or generic hardness statement is not a fit confirmation. Do not modify the machine to accept an uncertain part without the responsible technical party’s approval.
Plan spares around the consequence of a stoppage.
Routine wear stock
Use actual wear history, inspection intervals and consumption per machine. Keep frequently changed items grouped by assembly and label them with the machine reference. Agree quantities from the operating plan; there is no universal service-life figure for every slurry or site.
Critical long-lead items
Separate parts that stop the entire system from items that can wait for planned maintenance. Confirm current manufacture time, transport route and replenishment trigger in the offer. Material documentation, corrosion protection, packing and package identity belong in the same order.
Carry the identity through to the packing label.
Match each packing-list line to the agreed part number, revision, quantity and machine. Check the supplied dimensions and agreed documents before dispatch, then record receipt and any transport damage. Keep the accepted replacement record for the next order, including approved changes.
XILINK coordinates identification and factory follow-up for equipment sourced through us. For an unknown machine, send identification first; supply depends on establishing compatibility. Current availability, warranty and delivery terms require a specific offer.
Identify my wear parts
Send your original order reference and a photo of the worn assembly. This route supports our supplied equipment; it is not a universal part-number catalogue.
We review the requirements and identify the information the factory needs before preparing a scoped quotation. Unknown details can be discussed.
The supply and transport scope is checked for your destination, including the local installation boundary.