Convert the required lining area into whole rolls and packed mass. Use the result to compare a real membrane offer and establish what the loading plan still needs.
Copy the result into your enquiry and add the grade, destination and any known packed roll dimensions.
Calculate whole rolls and packed mass
Planning result
All defaults are illustrative assumptions. Replace them with factory and carrier data. The result does not check outside diameter, door clearance or legal route limits.Add results to my enquiryMaterial subtotal uses the purchased whole-roll area and your entered offer price. It excludes freight, taxes and installation; this is not an XILINK quotation.
See exactly where rounding changes the order.
Worked example using the starting inputs. These are illustrative assumptions, not recommended thickness, roll dimensions or carrier limits.
| Step | Calculation | Result means |
|---|---|---|
| Target area | 500 m² × 1.10 = 550 m² | 10% chosen allowance, applied once. The worksheet does not design overlaps or anchor trenches. |
| Whole rolls | 550 ÷ (7 × 100) → 1 | Round up to one whole roll, not 0.786 roll. The planned layout must still be checked. |
| Purchased area | 1 × 7 × 100 = 700 m² | Use purchased area for material mass. Do not add the 10% allowance a second time. |
| Material net mass | 700 × 1 × 940 ÷ 1,000 = 658 kg | Area × thickness in mm × density in kg/m³ ÷ 1,000. Use actual agreed material inputs. |
| Estimated gross mass | 658 + (1 × 20) = 678 kg | Includes the entered 20 kg packing per roll. Add all relevant core, wrapping, pallet and protection mass. |
Copy the result into your enquiry and add the grade, destination and any known packed roll dimensions.
Check my roll and loading planUse the roll schedule to compare a current offer.
Send the material grade, test specification and edition, thickness basis, finished roll schedule, packed dimensions and destination. Compare unit prices using the same purchased area and scope. Taxes, unloading and site installation are not calculated by this worksheet. XILINK coordinates the factory and transport clarification around the agreed order.
A weight minimum is not a loading plan.
Enter an allowable goods payload agreed for the actual container, carrier and inland route. The result is a lower bound based on gross weight. Roll outside diameter, core, door opening, floor loading, securing and loading geometry can require more containers. Do not substitute a universal “27 tonnes per container” rule.
Minimum by weight = gross mass ÷ allowable goods payload, rounded up
In the example, 678 kg ÷ 24,000 kg gives a weight minimum of one container. It says nothing about door clearance or whether the 7 m roll fits the chosen container and loading method. The entered payload is for goods including packing, not container gross weight including its tare.
Check the packed roll
Confirm width, outside diameter, core dimensions, gross mass and permitted stacking or support. Roll width is not the diameter. Use a packing drawing to check orientation, entry through the door and the handling equipment at both ends.
Check the actual route
Obtain the permitted load for the actual container and carrier, including road and rail legs. A carrier’s published fleet example is not a booking commitment. Floor distribution, securing and local handling can require a different load even when total mass is below the nominal limit.
Deal with an oversized single roll
Adding more containers does not split a whole roll. If one packed roll exceeds the entered payload, revise the factory roll schedule or agree another transport arrangement. Confirm that any smaller roll still works with the approved panel and seam layout.
1 · Develop the area
Use the actual floor, banks, edges and approved layout. A water surface measurement is not the liner quantity.
2 · Buy whole rolls
Add your allowance once, then round to the factory’s actual roll size. Purchased area can exceed the target area.
3 · Check the shipment
Material mass is not packed gross mass. Weight, dimensions, load support and the complete route all need checking.
Check my roll and loading plan
Copy the result into your enquiry and add the grade, destination and any known packed roll dimensions.
We review the requirements and identify the information the factory needs before preparing a scoped quotation. Unknown details can be discussed.
The supply and transport scope is checked for your destination, including the local installation boundary.
Discuss on WhatsApp