XILINK · Sludge dewatering
Geotextile tube dewatering

How many tubes, and what size? Start with dry solids, a representative sludge trial and the filling programme. Pumped slurry volume alone cannot give a reliable tube count.
What we coordinate for your order
We coordinate the tender, fabric and seam specification, trial questions and finished tube schedule. That connects the order to solids retention, filtrate handling and the space available on your site.
Send the sludge analysis or tender and the volume basis you have. Missing trial data is a question to resolve, not a reason to guess the order.
How many dewatering tubes? Start with dry solids
Surveyed sediment, pumped slurry and drained cake are different quantities. Water added during pumping changes the feed volume; drainage changes the retained mass. State whether solids are measured by mass or by volume. Water depth is not removal thickness.
Worked mass example: 100 t feed does not mean 100 m³ of tubes
Assume 100 t slurry at 2% dry solids by mass: 2 t solids and 98 t water. If all solids remain and the cake reaches an assumed 20% solids, cake mass is 2 ÷ 0.20 = 10 t, retaining 8 t water. The difference is 90 t removed water.
Arithmetic only, not a promised 20% result. Additives, carryover and other losses are excluded. These are masses, not tube volumes. Tube count still needs cake density, approved filling geometry and the tested fill/drain cycle matched to the required programme.
A sample trial should answer three purchase questions.
Use representative sludge and record where and when it was sampled. If the feed varies between zones or production periods, one convenient surface sample may not represent the project.
Will the fabric retain the solids?
Evaluate the selected fabric with the actual particle distribution and sludge chemistry. Opening size needs its stated test method. Fine particles, filter-cake formation and any conditioning affect behaviour, so a gram weight or micron value alone does not establish retention.
How will it drain and refill?
Record drainage over time, solids content and the effect of any proposed conditioning. Use these results to review feed rate, fill-and-drain cycles and available pad space with the supplier. A bench test screens options; a representative pilot may be needed to check the complete operating arrangement.
What happens to the filtrate?
Measure the filtrate against the project’s actual acceptance requirements. Visual clarity is not proof of discharge compliance. Collection, return to the process, additional treatment and disposal need a project-specific decision, including local permits and the nature of the retained solids.
Send the sludge analysis or tender and the volume basis you have. Missing trial data is a question to resolve, not a reason to guess the order.
Assess my dewatering jobThe tube is one part of a dewatering site.
Pump and any conditioning equipment matched to the approved filling limits and ports.
Supplier-defined dimensions, seam construction, fill height and pressure; leave room for access.
Ground capacity, liner or drainage layers and protection as required by the project design.
A controlled route to the agreed collection, return or treatment system.
Compare the fabric and the seam separately.
Our published August 2026 fabric reference lists these two EN ISO grades. The heavier fabric has a different specified seam minimum, so mass alone cannot select the finished tube.
| Published fabric grade | Fabric tensile MD / CD | Factory seam tensile |
|---|---|---|
| HS60 · ≥300 g/m² | ≥60 / ≥45 kN/m | ≥70 kN/m |
| 400 GSM · ≥400 g/m² | ≥90 / ≥90 kN/m | ≥60 kN/m |
MD and CD are machine and cross directions. The complete selection also needs opening size and its method, permeability, ports, dimensions and the sludge trial. Compare your tender’s specified methods and directions with the factory offer; confirm the current grade, construction and batch evidence before ordering.
Read the published tube and bag fabric reference (PDF)
Assess my dewatering jobTurn the test and tender into a complete supply schedule.
A comparable tube offer identifies the construction, filling interfaces and site-work boundary in writing. Resolve these together with the trial basis, so each factory prices the same dewatering task.
| Schedule line | Agree in writing | Why it matters |
|---|---|---|
| Tube construction | Dimensions and their basis, fabric properties and methods, seam requirements, ports and quantity. | Circumference, flat width and filled width are different dimensions. |
| Feed and accessories | Pump interface, hoses, connections and any agreed conditioning equipment or trial. | A tube-only quote can leave the filling and treatment process uncosted. |
| Programme and tube count | Required completion date, feed rate, tested fill/drain cycle, working hours and concurrent pad occupancy. | Use the trial to check throughput and occupied space together; nominal tube capacity alone does not establish completion time. |
| Site and end handling | Pad preparation, drainage, filtrate management, opening/removal of cake and disposal responsibilities. | A ground-supported dewatering tube is not automatically a lifting bag. |
Send the sludge description, measured solids basis, volume or mass, required programme, tender and a pad sketch. Mark untested values as unknown. XILINK coordinates the factory clarification, comparison and agreed supply scope; trial performance and local acceptance requirements remain explicit parts of the project.
Assess my dewatering job
Send the sludge analysis or tender and the volume basis you have. Missing trial data is a question to resolve, not a reason to guess the order.
We review the requirements and identify the information the factory needs before preparing a scoped quotation. Unknown details can be discussed.
The supply and transport scope is checked for your destination, including the local installation boundary.