XILINK · Geosynthetics procurement
Landfill liner systems
Price the HDPE membrane, geotextile and GCL against the same bill of quantities. Turn each approved line into rolls, packed weights and a shipment plan.
We coordinate the separate material offers and combined shipping scope. You see which quantities are confirmed, which GCL lines may be alternatives, and what is still needed to establish freight and container loading.
Send my lining bill of quantitiesSend the BOQ and destination. Keep unresolved alternatives marked; you do not need to settle them before the first discussion.

A real four-line material request.
A 2026 procurement enquiry for a project in Ivory Coast requested the following materials for delivery to Abidjan. These are the buyer’s original quantities, not a completed-project claim or a proposed landfill design.
Each requested line: 290,806.10 m²
| Original requested line | Question before ordering |
|---|---|
| HDPE · 2 mm | Confirm the grade, surface, thickness tolerance and roll schedule. |
| PP · 500 g/m² | Confirm required mechanical and hydraulic properties, not mass alone. |
| GCL · 5,300 g/m² | Is this an alternative to the next line, or a separate project zone? |
| GCL · 5,000 g/m² | Clarify bentonite loading versus total product mass for both GCL lines. |
Do not simply add the two GCL areas or replace one with the cheaper grade. If they are alternatives, adding both duplicates the order. If they serve different zones, dropping one leaves part of the project unsupplied. Resolve the engineer’s quantity basis first, then issue separate confirmed schedules for each material.
Landfill liner cost: rolls and freight change the total
Equal square metres can produce very different shipment weights and roll counts. Calculate each material separately before consolidating factories or requesting freight.
From the actual requested PP area
145.4 t290,806.10 m² × 0.500 kg/m² = 145,403.05 kg of nominal fabric mass, rounded above. This excludes cores, wrapping and handling materials. It is not the combined mass of the membrane and GCL order.
Do not apply the two GCL gram values directly to freight until their mass basis is confirmed. Likewise, membrane thickness needs the actual product density to become a mass estimate. Use the factory’s gross roll weights for the shipment, reconciled against the ordered roll list.
Roll schedule
By material: width, length, outside diameter, core, net and gross mass, quantity and roll identity. Nominal area alone does not reveal a bundle’s dimensions.
Container and route
Check permissible goods payload, floor loading, door clearance, securing and loading geometry against the carrier and inland route. Weight division gives a lower bound, not a proven container plan.
Receiving and sequence
Confirm unloading capacity, storage protection, roll lifting method and which material must arrive first. A consolidated shipment still needs clear factory, inspection and consignee responsibilities.
Send the BOQ and destination. Keep unresolved alternatives marked; you do not need to settle them before the first discussion.
Send my lining bill of quantitiesSimilar areas do not make these materials interchangeable.
Membrane: the polymer barrier
The specified sheet limits leakage. Confirm polymer, surface, thickness tolerance and durability tests. A 2 mm label alone does not establish the grade.
Geotextile: protection at the interface
Protection against specified contact and installation loads needs tensile and puncture properties, construction and relevant hydraulic tests. Fabric mass alone is not a protection rating.
GCL: the specified clay barrier
Confirm bentonite loading, total product mass, carrier layers and hydraulic properties. The clay system must be compatible with the project liquid and confinement conditions.
The approved section sets the layer sequence and interfaces, including drainage, subgrade and connections. More weight, thickness or texture is not automatically an equivalent substitution. Record any change in protection, welding, interface friction or chemical compatibility for designer approval before factories price a replacement.
Compare exceptions before accepting a total.
XILINK coordinates factory sourcing, offer comparison, the agreed inspection scope and shipment. The project designer remains responsible for the approved material system; installers and testing parties need their own agreed scope.
| Check | Keep in the comparison | What it prevents |
|---|---|---|
| Specification deviations | Requested value, offered value, method, edition and designer decision for every exception. | A lower price concealing a different material. |
| Evidence and identity | Reports for the named product and required methods, linked to samples or batches as agreed. | A generic certificate being treated as proof for the ordered rolls. |
| Quantity and exclusions | Confirmed bill, whole-roll quantities, packing, freight basis, welding and site-work boundaries. | Missing materials, double-counted grades or a supply price mistaken for an installed project. |
Send the project bill, specifications and section drawings together. If the GCL alternatives, test methods or roll restrictions are still unresolved, mark them clearly. We can organise the clarification list before factories quote against different assumptions. Current material and transport prices are quoted for the agreed scope and destination.
Send my lining bill of quantities
Send the BOQ and destination. Keep unresolved alternatives marked; you do not need to settle them before the first discussion.
We review the requirements and identify the information the factory needs before preparing a scoped quotation. Unknown details can be discussed.
The supply and transport scope is checked for your destination, including the local installation boundary.