XILINK · Sand extraction & shore processing
Sand dredgers & shore processing
Start with the finished sand you need each day. Match extraction, separation, dewatering and stockpiling as one production route.
What we coordinate for your order
We coordinate the dredger and shore-equipment questions around the feed and required product. The offer should state what is included, what yield is assumed and how the proposed process will be verified.
Send your sand sample or grading report, daily target and discharge route. Mark unknown information for review.
Assess my sand dredging lineThe dredger and pipe deliver solids and water together.
Screen, wash or classify as required by the sample and target grading.
Dewater and stockpile the accepted sand; its rate is the buying target.
Collect or treat the separate stream. Dashed return applies only where the approved water circuit permits reuse.
Functional material paths, not a fixed plant design. Shore stages must accept the planned feed; the limiting stage can constrain dredging even when pump capacity is higher.
Define the sand you need to sell.
The deposit sample
Provide representative samples and particle-size distribution, including oversize, silt and clay. Note whether the material changes across the deposit or depth. Cohesive material can need a different extraction and preparation method from free-flowing sand; one clean surface sample may miss the difficult layer.
The finished product
Identify the end use, required grading, permitted fines and moisture basis. Define the daily target as dry tonnes, wet tonnes or another agreed measure. Pumped slurry, recovered solids and a loose stockpile occupy different volumes; the offer must not silently substitute one output basis for another.
Sand dredger output: mixture flow is not saleable sand
Illustrative mass balance, not a production promise
- Feed at 20% dry solids by mass
- 100 t/h
- Dry solids entering the process
- 20 t/h
- At an assumed 70% saleable fraction
- 14 t/h
Under these assumptions, the feed includes 80 t/h water. Of the 20 t/h dry solids, 14 t/h becomes the specified product and 6 t/h is outside that product stream. Actual yield comes from the deposit and process testing. Wet stockpile tonnes also include retained water; this example does not convert tonnes into m³ or size a dredger.
Send your sand sample or grading report, daily target and discharge route. Mark unknown information for review.
Assess my sand dredging lineChoose the supply boundary before comparing prices.
| Supply route | Suitable starting situation | Resolve the interface |
|---|---|---|
| Pump and pipeline | An existing extraction or feed arrangement needs a matched slurry-transfer package. | Confirm the feed, drive, pipe pressure and shore inlet. A pump package does not include an excavation platform by default. |
| Complete dredger | The project needs the floating platform, extraction head, pump, controls and movement arrangement together. | Confirm depth range, material, anchoring or positioning, assembly access and transport modules. |
| Dredger plus shore process | The buying target is a specified sand product, not only sediment moved to the bank. | Match screen, washing/classification, dewatering, conveyors, water return and waste handling to the tested feed. |
The receiving end can limit the whole dredger.
Route duty
Send discharge distance, bends, lift and the water-level range. Pump and pipeline selection must use the actual slurry and required rate. Adding engine power or choosing a pipe diameter alone does not establish the operating point or a booster requirement.
Shore throughput
The inlet, screening and dewatering stages must accept the material and water delivered. Identify the stage that constrains the product target and the usable stockpile space. A higher mixture flow can overload the plant without increasing the tonnes of sand that meet the required specification.
Water and fines
Show where process water returns and where fines are collected or treated. The water circuit and disposal route are part of the site brief. The responsible local parties confirm site permissions and operating requirements; an equipment offer does not supply extraction rights.
Make the proposal answer the same three inputs.
| Send this | Factory clarification to obtain |
|---|---|
| Sample and grading | The proposed extraction/preparation route, screening or classification duty and the material assumptions behind product yield. |
| Discharge and shore sketch | Matched pump duty, pipe and floats, receiving equipment and the controlled water/fines route. |
| Product target and programme | A consistent dry/wet output basis, operating hours, test conditions, factory demonstration and the remaining site acceptance checks. |
XILINK coordinates proposals for the agreed dredger, transfer line and shore scope. Each offer should separate equipment, power, wear parts, testing, freight and assembly, with its sample assumptions and acceptance boundary in writing. Mark unknown inputs so they are clarified before the order.
Assess my sand dredging line
Send your sand sample or grading report, daily target and discharge route. Mark unknown information for review.
We review the requirements and identify the information the factory needs before preparing a scoped quotation. Unknown details can be discussed.
The supply and transport scope is checked for your destination, including the local installation boundary.