Steel from China · Billets · Sections · Fabricated Structures
A low unit price is only one line of a steel purchase. Check the dimensions and tonnage, how the final price is set, and who receives the payment. A real buyer enquiry for 1,000 tonnes to Poti shows why the proforma invoice and the material certificate must be read separately.
Material certificate
10 pieces stated as 40 t → 14.72 t theoretical at 125 × 125 × 12,000 mm
Proforma invoice
US$310/t EXW + US$40/t freight, with a shipment-date pricing clause
Payment details
The beneficiary name differs from the seller name; the relationship needs checking
These were documents sent for checking before payment, not a completed shipment. The weight discrepancy is in the certificate. The pricing and bank details are in the PI. Neither document alone establishes the actual goods or their quality.
The First Check · Spec → Tonnage
For a solid square billet, section area × length × an assumed steel density gives a theoretical weight. It is a consistency check, not a weighbridge result. In this enquiry the certificate lists 125 × 125 × 12,000 mm, 10 pieces and 40 tonnes. Those figures need clarification before payment.
The theoretical calculation
0.125 × 0.125 × 12 m = 0.1875 m³
0.1875 m³ × 7.85 t/m³ = 1.471875 t per piece
10 pieces = 14.71875 t, not the certificate’s 40 t
Assumption: a solid square section and 7.85 t/m³ density. Dimensions, tolerances and actual weighing still need verification.
What the discrepancy tells you
Use the agreed material and dimensional tolerances when checking the final weight. The calculation does not identify a steel grade.
Ask for the correct certificate and packing list. A wrong size, piece count or weight entry can cause the mismatch; the document alone does not identify which.
| Document / line | What is visible | What to verify |
|---|---|---|
| MTCdimensions and mass | 125 × 125 × 12,000 mm; 10 pieces; 40 tonnes. | Theoretical mass is 14.72 t. Match the corrected document to the actual batch and obtain weighing evidence. |
| PIprice and balance | US$310/t EXW plus US$40/t freight. The text also refers to market pricing at shipment. | Confirm whether the price is fixed or adjustable, what the formula is and which costs are included. The headline total does not resolve the clause. |
| MTCchemistry | C 0.18%, Mn 0.55%, Si 0.25% are shown in the certificate excerpt. | These entries alone do not establish Q235B, St3sp or any other grade. Check the complete certificate against the contracted standard and heat number. |
Approximate theoretical weights · density 7.85 t/m³
Ø12 mm round bar0.89 kg/m; 250 × 12-m pieces ≈ 2.66 t100 mm solid square78.5 kg/m; one 12-m piece ≈ 0.94 t125 mm solid square122.66 kg/m; one 12-m piece ≈ 1.47 tA discrepancy is a reason to ask for evidence before paying. Send the full PI and certificate together, not only the total or a cropped weight line. Describe your steel order.
The Second Check · Compare Like for Like
Compare offers for the same grade, dimensions, quantity and delivery term. A market index can provide context, but it is not a mill quote or proof of production cost. Ask the supplier to explain the scope of these four items.
BASE
Price basis
Record the quote date, currency, validity and delivery term. If the price floats, identify the reference, adjustment date and calculation in writing.
GRADE
Grade & specification
Specify the standard, grade, dimensions and tolerances. Do not treat grades under different standards as interchangeable without a technical check.
WORK
Processing & finishing
Identify cutting, drilling, welding, galvanising and packing. Ask which are included and which require an additional charge.
DOCS
Documents & testing
Agree the certificate, inspection and testing scope. The product, intended use and destination determine what documents need checking.
Resolve the price clause before the deposit
The August 2026 PI shows a headline price and a separate shipment-date market-price clause. That makes the final amount unclear until the parties agree how the clause operates.
A low quote is a prompt to compare scope and terms — not proof of fraud.
Ask: “Is this amount fixed? If it changes, which reference and date determine the balance?” Have the answer reflected in the agreed documents.
The Third Check · Freight
Dense steel and bulky structures use transport space differently. Confirm payload, floor loading, securing and local transport limits with the carrier. The two enquiries below show the information buyers need; neither is presented as a completed delivery.
Dense, shorter cargo
Check usable internal dimensions and permitted payload. The container plate alone does not settle road, rail or port restrictions.
Confirm before bookingLonger sections & structures
A longer box does not automatically allow twice the weight. Check section length, door opening and the proposed loading method.
Check access and securingBreakbulk and rail
Compare available routes using the actual packing list, quantity and schedule. There is no universal tonnage threshold that decides the cheapest mode.
Compare the complete routeEnquiry A · Billet to Poti
Enquiry B · Structures to Hairatan
XILINK equipment-loading footage: crane to flatbed. It illustrates loading coordination only; it does not show the Poti or Hairatan cargo, or a completed steel order.
The Fourth Check · Import Requirements
“Steel” is not enough to determine import treatment. Give your customs broker the product description, composition, processing, country of origin and intended use. Confirm the applicable classification and requirements for the planned entry date.
United States
Ask the broker to confirm current tariffs and any product- or producer-specific trade measures for the exact classification.
Do not use a blanket percentage from a general steel guide as the landed-cost budget.
European Union
Ask which tariff measures, quotas, carbon-related obligations and product documentation apply to this specific shipment.
The applicable requirements depend on product scope, origin, importer and entry date; confirm them before committing.
Central Asia · Caucasus
Do not apply one certificate requirement to every steel product or every country. The product’s use and local rules matter.
Have the importer confirm the required documents, issuer and acceptance route before the supplier prepares them.
The Fifth Check · Payment
Payment terms belong in the individual contract. The checks below identify questions to resolve; they are not a universal deposit schedule or a legal finding about a supplier.
What to establish
What needs clarification
Before Loading · The Physical Checks
Agree an inspection scope for the product and its intended use. A billet for re-rolling, a finished section and a welded frame need different checks; photographs alone cannot establish material compliance.
Match heat or lot identifiers on the certificate, packing list and material markings. Check the contracted grade and standard; partial chemistry values do not establish equivalence.
Define sampling, test methods and acceptance criteria before inspection. Testing a billet may focus on chemistry and internal condition; do not automatically apply finished-product tensile tests to an unrolled billet.
Measure the specified section size, thickness, length and relevant coating or fabrication dimensions. Record piece counts and agree how weight will be established.
Assess corrosion protection, bundle support, lifting and restraint for the route. Record condition and loading; agree how any discrepancies will be resolved before shipment.
Next Step
Start with the PI or quote, the material certificate if available, and your destination. Tell us whether you need supplier sourcing, a document check, inspection or transport coordination. We can then clarify the scope and information needed.
What to send
How to proceed
Where to send it
Send documents through WhatsApp or email. For the first message, the product, destination and question are enough.