XILINK · Tank-liner material & fabrication
Water tank liners
Fit the liner to the tank you have: base profile, walls, outlets and top fixing. Diameter and height are the start of the enquiry, not a complete fabrication drawing.
What we coordinate for your order
We coordinate the factory’s material and fabrication scope around your measured tank. Clarify whether the offer is sheet material or a fabricated liner, and which connections and installation work are included.
Send an internal sketch, outlet photos and intended water use. Unknown fixing details can be discussed.
A tank liner quote starts with the internal drawing
A recorded 2020 stock-water-tank enquiry requested 1,000 m². That quantity establishes a buying need, not a tank shape or a completed installation. For fabrication, each tank type needs the following details.
| Detail | Record for fabrication |
|---|---|
| Inside geometry | Diameter at the relevant levels, or internal length/width; wall height, taper, floor shape, corners and any steps. Outside nominal tank diameter is not enough. |
| Top and edges | Termination or clamp drawing, cover connection if required, and the level to which the liner must extend. Mark the measurement datum. |
| Pipes and openings | Position from an agreed datum, actual outside diameter, flange/boot connection and accessible working space. Do not cut openings from a guessed centreline. |
| Quantity by shape | Number of each tank type and whether drawings repeat exactly. Confirm drawing revision before manufacture. |
Specify what the factory is supplying.
Whole rolls
Material for an installer to cut and weld. Agree grade, thickness, test basis, roll dimensions and quantity. This does not include a fitted shape by default.
Prefabricated panels
Factory-welded pieces to an approved drawing. Confirm panel identification, packing folds, remaining field seams and test records. Factory panel size must work with site access.
Formed tank liner
A shape assessed for manufacture against accepted internal measurements. Agree dimensional tolerances, top and pipe details, test scope and installation boundary before approving production.
Send an internal sketch, outlet photos and intended water use. Unknown fixing details can be discussed.
Send my tank drawingUse area to check the order, not to replace the drawing.
Open cylindrical tank
Illustration: D = 6 m, H = 2 m gives 28.27 m² bottom + 37.70 m² wall = 65.97 m². It assumes a vertical cylinder and flat circular floor. No roof, overlaps, clamping allowance, pipes, cutting waste or fabrication shrinkage is included.
Rectangular or irregular tank
For an open vertical-wall rectangle, the net surface is floor length × width plus perimeter × lining height. Tapered walls, sumps, steps and rounded corners need their own developed dimensions. Avoid turning one approximate total into an unapproved rectangular cut sheet.
The factory proposes the seam and fabrication plan against the accepted measurements. Purchase area, cut-panel area and the finished installed surface can differ.
The existing tank needs its own preparation and fixing plan.

Support and protection
Record corrosion, roughness, sharp projections, cracks and unsupported gaps. The liner is not a structural repair. The responsible installer and project designer define surface preparation, support and any compatible protection layer before the liner is placed.
Attachment and water pressure
Agree how the liner is supported and terminated when empty, filled or being cleaned. Groundwater or liquid trapped behind a liner can change loading. Connections, clamping and operating limits require the approved project, not a generic membrane thickness.
Access and installation
Provide access-opening sizes and the available handling space. A factory-welded liner still needs an installation sequence, fitting details and acceptance checks. Confirm whether work is factory prefabrication only, field welding, installation attendance or another separately defined service.
Match water-contact evidence to the exact product and use.
State livestock, irrigation, process or drinking-water use, temperature and cleaning chemicals. If the project requires a specific water-contact approval, check its current product listing, formulation, conditions and limits. A factory quality-system certificate or an unrelated product’s report does not establish suitability for drinking water.
Health-effects approval and mechanical suitability are separate checks. The completed liner also needs the agreed seam, fitting and site acceptance records. XILINK coordinates drawing clarification and factory comparison; current availability, certification and supply terms are confirmed for the specific offer.
Send my tank drawing
Send an internal sketch, outlet photos and intended water use. Unknown fixing details can be discussed.
We review the requirements and identify the information the factory needs before preparing a scoped quotation. Unknown details can be discussed.
The supply and transport scope is checked for your destination, including the local installation boundary.